Live Mitchell Highway, Charleville Traffic Map
Related IncidentsView All »
29 Nov, 2011 - 8:00 PM
29 Nov, 2011 - 7:00 PM
Due to Testing of the levy bank gates at the Warrego River Bridge on the Mitchell Highway 23B in Charleville there will be closure on the 29 November 2011 from approx 8pm to 10pm. There will be a detour in use, this will take vehicles over the old bridge which has a 15 tonne load limit. An expected delay of 30 to 40 minutes over the new bridge.
6 Sep, 2014 - 8:39 AM
Single vehicle Crash All directions
30Kms South of Charleville.
Road closed both directions
Long delays expected. Use alternative route.
Road Closed
Last edited: 06 Sep 2014 08:40