Latest Traffic Incidents for Kenilworth, QLD

All directions
3 Nov, 2024 - 7:00 AM
6 Nov, 2024 - 7:19 AM
Roadworks - Planned roadworks
The Department of Transport and Main Roads (TMR) will be undertaking routine maintenance works on a bridge that spans Obi Obi Creek on Obi Obi Road. The bridge, known as Obi Obi Creek No. 1, requires a replacement bridge deck and new wearing surface. The works will typically take place at night, requiring temporary road closures during these time. Delays of up to 15 minutes can be expected while the work site is made safe to allow vehicles to pass. One lane of the bridge will be closed at all other times, with traffic movements controlled by temporary traffic lights. Key works • Replacing the existing metal bridge deck with timber. • Application of new asphalt wearing surface. • Guardrail to be removed and reinstated to facilitate access for decking to be removed and replaced. • Reinstating line marking and delineation. What to expect • Works are scheduled to begin in early November 2024 and will take up to five weeks to complete.
Both directions
31 Oct, 2024 - 8:04 PM
31 Oct, 2024 - 9:12 PM
Hazard - Debris on road - Fallen vegetation
All directions
28 Oct, 2024 - 7:00 AM
24 Oct, 2024 - 5:39 PM
Roadworks - Planned roadworks
The Department of Transport and Main Roads (TMR) will be undertaking routine maintenance works on a bridge that spans Obi Obi Creek on Obi Obi Road. The bridge, known as Obi Obi Creek No. 1, requires a replacement bridge deck and new wearing surface. The works will typically take place at night, requiring temporary road closures during these time. Delays of up to 15 minutes can be expected while the work site is made safe to allow vehicles to pass. One lane of the bridge will be closed at all other times, with traffic movements controlled by temporary traffic lights. Key works • Replacing the existing metal bridge deck with timber. • Application of new asphalt wearing surface. • Guardrail to be removed and reinstated to facilitate access for decking to be removed and replaced. • Reinstating line marking and delineation. What to expect • Works are scheduled to begin in early November 2024 and will take up to five weeks to complete.
Both directions
27 Oct, 2024 - 12:27 PM
27 Oct, 2024 - 12:29 PM
Crash - Single vehicle
All directions
19 Sep, 2024 - 12:00 AM
9 Sep, 2024 - 7:59 AM
Roadworks - Planned roadworks
Slope stabilisation works Batter trimming and soil nail shotcrete works on up slope and down slope. Active works speed reduction 40km/h, 60km/h after hours. 19 Sep to 25 Feb. Soil nail works will require permanent lane closure. Batter trimming will be reopened at the end of each day shift
All directions
13 Aug, 2024 - 1:30 PM
13 Aug, 2024 - 1:36 PM
Hazard - Debris on road - Spill
Northbound towards Kenilworth
8 Jul, 2024 - 11:21 AM
8 Jul, 2024 - 2:47 PM
Crash - Single vehicle
All directions
16 Jun, 2024 - 7:06 PM
16 Jun, 2024 - 7:08 PM
Crash - Single vehicle
All directions
30 Jan, 2024 - 2:05 PM
30 Jan, 2024 - 2:20 PM
Flooding - Flash flooding - Water over road
Both directions
30 Jan, 2024 - 1:45 PM
31 Jan, 2024 - 12:36 PM
Flooding - Flash flooding - Water over road